Goreway Drive Improvement Project

Road Closures

Goreway Drive between Brandon Gate Drive and Kenview Boulevard will be closed from summer 2023 to fall 2024 to build the overpass throughout the construction period.

Overview

This is a joint project between the City of Mississauga, the City of Brampton and CN Rail focused on improving Goreway Drive by creating a grade separation over the CN tracks. Goreway Drive crosses CN rail 300 meters north of Brandon Gate Drive and supports about 50 freight trains a day. There are 3 tracks running that allow freight trains into and out of CN Rail’s Brampton Intermodal Terminal north of the project area. Goreway Drive is currently a major collector roadway in Mississauga and a 4-lane arterial roadway in Brampton providing north-south connectivity for all sorts of vehicles between the cities.